Serial Range Four-Stroke Outboard 60 - DF60AT 610001~ SIDE COVER (DF50A E03) diagram

1
Suzuki Marine
RUBBER,SIDE COV61112-88L10
Required: 1
RUBBER, SIDE COVER
$57.35
You save $10.12

2
Suzuki Marine
SEAL,SIDE COVER61134-88L11
Required: 1
SEAL, SIDE COVER
Supersedes: 61134-88L10
$44.50
You save $7.85

3
Suzuki Marine
COVER,SIDE STBD61811-88L20-0EP
Required: 1
COVER, SIDE STBD (BLACK)
$438.82
You save $77.44

3
Suzuki Marine
COVER,SIDE STBD61811-88L20-Y5S
Required: 1
COVER, SIDE STBD (WHITE)
$438.82
You save $77.44

4
Suzuki Marine
COVER,SIDE PORT61821-88L20-0EP
Required: 1
COVER, SIDE PORT (BLACK)
$438.82
You save $77.44

4
Suzuki Marine
COER,SIDE PORT61821-88L20-Y5S
Required: 1
COVER, SIDE PORT (WHITE)
$440.97
You save $77.82
5
Suzuki Marine
SCREW09139-06249
Required: 10
SCREW (6X35)
Supersedes: 09136-06148
In stock
5+ in stock
$1.90
You save $0.47

6
Suzuki Marine
CUSHION,SIDE CO61151-88L01
Required: 1
CUSHION, SIDE COVER
Supersedes: 61151-88L00
$3.37
You save $0.59

7
Suzuki Marine
PANEL,FR61831-88L10-0EP
Required: 1
PANEL, FRONT (BLACK)
$118.62
You save $20.93

7
Suzuki Marine
Front Panel61831-88L10-Y5S
Required: 1
PANEL, FRONT (WHITE)
$118.62
You save $20.93

8
Suzuki Marine
BOLT(8X38)09116-08174
Required: 2
BOLT (8X38)
Supersedes: 09116-08163
In stock
Only 1 remaining
$4.08
You save $1.02

9
Suzuki Marine
WASHER,FRONT PA09169-08050
Required: 2
WASHER
Supersedes: 09169-08039
$6.45
You save $1.14

10
Suzuki Marine
CUSHION,FRONT P09320-11023
Required: 2
CUSHION
Supersedes: 09320-11013
In stock
Only 1 remaining
$2.75
You save $0.49

11
Suzuki Marine
HOOK,FRONT PANE61412-88L00
Required: 1
HOOK, FRONT PANEL
$14.70
You save $2.59
In stock
Only 5 remaining
$1.51
You save $0.38

13
Suzuki Marine
SHAFT,ENGINE CO61632-93J00
Required: 1
SHAFT, ENGINE COVER HOOK
$35.48
You save $6.26

14
Suzuki Marine
HOOK,ENGINE COV61641-88L00
Required: 1
HOOK, ENGINE COVER
$14.72
You save $2.60
$2.65
You save $0.66

16
Suzuki Marine
LEVER,HOOK REAR61633-88L00
Required: 1
LEVER, HOOK REAR
$14.95
You save $2.64

17
Suzuki Marine
WASHER,13.2X25X09160-13014
Required: 1
WASHER (13.2X25X1)
$2.87
You save $0.72
$1.96
You save $0.49
$2.66
You save $0.47
In stock
Only 1 remaining
$2.49
You save $0.62

21
Suzuki Marine
Hose09352-50901-600
Required: 1
HOSE (5X9X600)
$8.46
You save $1.49
22
Suzuki Marine
LATCH,HOOK LEVE61673-93J12
Required: 1
LATCH, HOOK LEVER
Supersedes: 61673-93J11
$8.98
You save $1.59
-50%

23
Suzuki Marine
BOLT09116-05010
Required: 2
BOLT (5X12)
In stock
Only 3 remaining
$1.19
You save $1.19

24
Suzuki Marine
GROMMET,R/CON C61124-88L11
Required: 1
GROMMET, REMOCON CABLE
Supersedes: 61124-88L10
$11.92
You save $2.10

25
Suzuki Marine
Clamp09407-25402
Required: 1
CLAMP (L:250)
$4.81
You save $0.85
Required quantity shown is the quantity used per assembly. Prices are based on a quantity of one and all items are sold individually.






